Shell draugen platform4/25/2024 ![]() ![]() OKEA acquired its interests in the Draugen and Gjøa offshore fields in Norway for 4.52 Billion NOK (US$526 million) from Shell in 2018.ĭraugen achieved peak output of about 225 000 bopd in 2001. The GBS was installed at the Haltenbank area on the Norwegian continental shelf in May 1993 for A/S Norske Shell. ![]() The platform topsides stand on a concrete gravity-based structure. The paper gives a general description of the Concrete Gravity Base Structure (GBS) for the Draugen platform installed by Norwegian Contractors a.s. Stabilised oil is stored in tanks at the base of the facility. The field has been developed with a concrete fixed facility and integrated topside and has both platform and subsea wells. The Draugen wind farm project also fits well with Odfjell Oceanwind`s long term strategy to become a leading global floating wind farm O&M and technology provider”, says Odfjell Oceanwind CEO Per Lund.ĭraugen field started producing oil in October 1993, via an integrated production, drilling and quarters Draugen platform. The Draugen field in the Norwegian Sea was operated by Shell until it was sold to OKEA in 2018. “We look forward to further exploring this exciting opportunity in close collaboration with OKEA and TrønderEnergi. The study will include early-stage technical, economical and regulatory evaluations, as well as the potential impact on the environment and climate," the company added. "The wind farm may also serve the purpose of a flexible storage location for Odfjell Oceanwind’s Mobile Offshore Wind Units (MOWUs), producing renewable energy in between contract periods for off-grid applications. "The intention of the potential wind farm is to provide renewable power to the Draugen platform and utilize the Draugen infrastructure, including the planned power from shore cable," Odfjell Oceanwind said. Here you can read about the reservoir's structure and the challenges related to the development. It is developed with a concrete platform with one leg and several underwater installations. The Draugen oil field sits in about 250 meters of water, and is located around 150 kilometers north of Kristiansund. The Draugen field is one of the largest oil fields on the Norwegian continental shelf and the first one that came into production in the Norwegian Sea. Operations on Norske Shells Draugen platform could be extended to around 2020 if the company achieves its goal of 75 recovery. The official opening of Draugen took place on the 1st of december 1993. Several records were broken when this facility, ranked at the time as the world’s tallest and most northerly, came on stream in 1993. The news was shared by the recently formed floating wind tech developer Odfjell Oceanwind which said Friday it had entered into a Memorandum of Understanding with OKEA and the utility company TrønderEnergi to jointly evaluate the potential of developing a floating offshore wind farm connected to the Draugen platform. The Draugen platform has been highly productive and reliable. Norwegian oil and gas company OKEA, the operator of the giant Draugen platform off Norway, is working on a project that will see the offshore oil production facility powered by floating wind turbines.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |